Latest Projects
Project name: Bristol General Dome
Materials Used: Auroco Plywood, 6mm exterior plywood
Time Frame: 8 weeks from receipt of PO
Services Offered: Source material, Design, CNC cut, build, delivery
Project Description: design, issue of drawings for structural calculations to be produced from, CNC components, assemble within tolerances specified in sections to enable installation, skin structure, deliver in 2 loads.